Four-gate engineering release worksheet Version 1.0 | 2026-11-25 BLANK PLANNING WORKSHEET. Not a signed release, approved drawing, calibration certificate or test report. Agree the project-specific scope and authorized decisions before proceeding. Project and controlled baseline Project / assembly / PO reference: __________________________ Customer legal entity / responsible contact: _________________ Supplier legal entity / responsible contact: __________________ Drawing / technical specification / BOM revisions: ___________ Requested WLL and units / quantity / destination market: ______ Body origin, pin and signal/readout configuration: ____________ Applicable requirements / NDA reference / document register: ___ Gate 1 - written scope / engineering definition Included, optional and excluded deliverables / revision: ______ Open items, owner, due date and effect on release: ____________ Decision [release / hold / reject], scope and record date: ______ Customer authorized name / signature / date: _________________ Supplier authorized name / signature / date: _________________ Gate 2 - drawing freeze / agreed prototype build Approved drawing, interfaces, fits and test-plan revisions: ____ Open items, accepted deviations and re-review actions: ________ Decision [release / hold / reject], scope and record date: ______ Customer authorized name / signature / date: _________________ Supplier authorized name / signature / date: _________________ Gate 3 - prototype / verification acceptance Actual sample serials, reports and acceptance criteria: _______ Results, deviations, disposition and retest requirements: ______ Decision [accept / hold / reject], scope and record date: _______ Customer authorized name / signature / date: _________________ Supplier authorized name / signature / date: _________________ Gate 4 - production baseline / defined batch Accepted drawing, BOM, process and inspection revisions: ______ Released quantity / batch identity / handover records: ________ Decision [release / hold / reject], scope and record date: ______ Customer authorized name / signature / date: _________________ Supplier authorized name / signature / date: _________________ Changes and delivery commitments Change request ID / reason / affected records or batches: ______ Effects on design, tests, cost, schedule and reopened gates: ___ Agreed drawing, prototype, witness and dispatch dates: ________ A blank field is unresolved. A website selection or copied email does not execute this record. Keep completed, authorized project records and superseded revisions identifiable. LoadShackle.com | inquiry@loadshackle.com