On-load mechanical release project review worksheet Version 1.0 | 2026-11-27 Blank project-input worksheet. Not an approved design, operating procedure, product specification or certificate. Project and required interfaces Retained load / release load / units and load direction: _____________________________________ Actuation method and command interface: _____________________________________ Secondary retention / loss-of-power state / reset: _____________________________________ Released-line travel / stored energy / exclusion area: _____________________________________ Mating connection / available envelope / drawing revision: _____________________________________ Supply and acceptance scope to agree Requested WLL / force range AND units: ________________________ Quantity / matched set / destination / requested date: __________ Existing drawing and revision: ________________________________ Company / project and unresolved points: ______________________ Requested records: [drawing / material / calibration / proof / NDT / applicable conformity / witnessing] These are project requirements, not a statement that the requested configuration is already approved or available. Confirm the actual model, offered scope, price and delivery in writing. Agree confidentiality before sharing sensitive drawings. Attach CAD in your own email application. Request separate quotation for engineering/tooling, test fixtures, special material/finish batches, witnessing, packaging, freight and taxes. The project review must define holding/release states, secondary retention, command/power/pressure loss behavior and stored-energy recovery/exclusion requirements. No fail-safe state is assumed. Reference page: https://loadshackle.com/on-load-quick-release-shackles LoadShackle.com | inquiry@loadshackle.com