Black stage monitoring project review worksheet Version 1.0 | 2026-11-27 Blank project-input worksheet. Not an approved design, operating procedure, product specification or certificate. Project and required interfaces Point count / point IDs / requested range per point: _____________________________________ Truss / roof / hoist layout and drawing revision: _____________________________________ Receiver / software / display and logging request: _____________________________________ Alarm response and responsible operating role: _____________________________________ Black finish / identification / inspection requirements: _____________________________________ Supply and acceptance scope to agree Requested WLL / force range AND units: ________________________ Quantity / matched set / destination / requested date: __________ Existing drawing and revision: ________________________________ Company / project and unresolved points: ______________________ Requested records: [drawing / material / calibration / proof / NDT / applicable conformity / witnessing] These are project requirements, not a statement that the requested configuration is already approved or available. Confirm the actual model, offered scope, price and delivery in writing. Agree confidentiality before sharing sensitive drawings. Attach CAD in your own email application. Request separate quotation for engineering/tooling, test fixtures, special material/finish batches, witnessing, packaging, freight and taxes. Reference page: https://loadshackle.com/stage-rigging-black-load-shackles LoadShackle.com | inquiry@loadshackle.com