Skip to content
LoadShackleINSTRUMENTED RIGGINGEngineering desk
Menu

LoadShackle / Product configurations / Cabled load shackles

LSH-BOW / WIRED INTEGRATION

Cabled load shackles. Bring the load signal into your control system.

Keep power, measurement and maintenance access in the installation plan. For permanent hoists, shipboard A-frames and tension monitoring, match the complete instrumented connection to the input your PLC or indicator actually provides.

Configuration review ·

Silver instrumented bow and waisted central bobbin next to an attached black four-key force indicator with eight status dots and a left cable connector
Instrumented shackle with attached local indicatorSupplier-source configuration reference, edited on white with identifier cleanup. The four-key indicator and visible unit labels do not establish PLC output, connector pinout, calibrated range or a supplied LSH rating; match the actual measurement chain and records.

SIGNAL TYPE / RECEIVING INPUT / POWER ARRANGEMENT

Choose the input architecture before fixing the cable.

Bridge to matched electronics

For a dedicated indicator or bridge input, request rated sensitivity, excitation, bridge impedance, zero balance, four/six-wire arrangement and cable length.

Excitation, sense and measurement leads have different functions. Six-wire sensing can compensate excitation lead drop in a compatible system; a connector shell does not reveal which functions are fitted.

Analog signal to a PLC

For 4–20mA or 0–10V, identify the receiving input, transmitter power topology, measurement span, input burden/impedance and any reference/isolation requirement.

A separately powered amplifier and a loop-powered transmitter need different arrangements. State the exact devices, rather than choosing a wiring scheme from the signal name.

Digital value to a controller

For RS485 Modbus RTU, provide the controller, network layout, power arrangement and required data/update behavior.

Obtain the actual device address, baud/parity/stop settings, register/function definition, units, scaling and byte/word order before commissioning.

Background: Analog Devices’ bridge measurement explanation describes excitation, differential measurement and sense leads; it is not an LSH terminal map.

Trace each interface by function.

Signal architecture by function — conceptual only, not a terminal wiring diagram

mV/V bridge

  1. Excitation +/− and signal +/−
  2. Matched bridge amplifier / indicator
  3. Scaled output to the receiving system

4–20mA

  1. Specified loop-powered or separately powered transmitter
  2. Compatible current input and agreed supply arrangement
  3. Engineering-unit scaling and fault handling

0–10V

  1. Specified voltage transmitter and supply
  2. Matched voltage input / reference / isolation
  3. Engineering-unit scaling and ground-reference review

RS485 Modbus RTU

  1. Specified power and serial connection
  2. Configured bus, device address and register map
  3. Decoded value, scale, status and freshness

No terminal numbers, cable colors, A/B polarity or register addresses are assigned here. Use the issued drawing for the exact transmitter and receiving input.

For current-loop supply and input design, see NI’s current-loop fundamentals. For the serial architecture, see the Modbus serial implementation guide V1.02. The selected equipment manuals and released connection drawing control the installation.

Agree signal full scale separately from lifting WLL.

State engineering units, zero/tare definition and the force represented at full output. The electronics span, the pin’s calibrated measuring range and the complete assembly’s working load limit are separate items in the specification.

ILLUSTRATIVE SIGNAL MAPPING / NOT A PRODUCT RATING

A hypothetical 0–50kN channel, mapped to 4–20mA.

Assume an agreed linear signal: 4mA = 0kN and 20mA = 50kN. This is an arithmetic example, not the WLL, calibration or output configuration of a pictured shackle.

F = F₀ + [(I − 4mA) / 16mA] × (F₁ − F₀)

Example values for F₀ = 0kN; F₁ = 50kN
CurrentNominal spanExample force
4mA0%0kN
8mA25%12.5kN
12mA50%25kN
16mA75%37.5kN
20mA100%50kN

Confirm zero/tare, span, units, receiver raw counts and filtering for the actual supplied channel. Out-of-span or lost signals need the defined fault response; do not silently clamp them into a valid zero-load reading.

For a bridge, rated sensitivity in mV/V and actual excitation determine the low-level full-scale signal. For a digital output, a register value needs its documented scale and status. Neither signal amplitude nor a numerical display increases the allowable mechanical load.

Protect the moving connection and the signal exit.

Review pin orientation, keeper access, usable bearing contact and the path of the hook or sling. Define strain relief, bend allowance, impact guard, fixed/moving cable sections and accessible disconnects.

  • Specify connector series, contact count and mating half.
  • Provide cable length, route, shielding and junction requirements.
  • Define exposure, immersion, temperature and any hazardous-area requirement.
Move a submerged requirement to the subsea review
Instrumented bow shackle and sensing pin next to a large coil of black signal cable, diagonal view
Cabled assembly and cable-route referenceActual source-based hardware image. Cable length, jacket, connector, guard and electrical topology are project selections, not dimensions or ratings inferred from the photograph. Forging marks do not qualify the completed LSH measurement assembly.

Make the commissioning handover repeatable.

  1. Identify the configurationAssembly/serial, mechanical drawing, electrical diagram and selected readout/input.
  2. Agree the test methodQualified personnel, approved fixtures/procedure and the distinction between input simulation, calibration and structural proof.
  3. Record the channel settingsZero/span, units, filtering, actual raw counts or register scale, and channel identity.
  4. Check failure behaviorDefine power/signal loss, stale data, indication and any separately assessed control interface.

Use the wired integration worksheet to keep the receiving input, supply, connector and scale in one handover record. It is a blank preparation sheet, not an operating instruction or issued wiring diagram.

Specify the complete calibration and document chain

DRAWING REVIEW / EMAIL RFQ

Build a specification your engineer can review.

Choose the connection, signal and documents. Review the complete English RFQ, then open your email app or copy it into your existing project thread.

Attach your drawing in your own email app. Company information and selections stay in this browser until you choose to send or copy them.

Selected option allowancesProject quote

Budget additions only. Items marked Project quote, the base assembly, interface matching and third-party attendance are quoted separately.

Download RFQ worksheets and the NDA draft

Request scope and units

Changing units converts entered numeric loads and dimensions. Depth and drawing notes keep their explicitly stated units. Converted numbers are nominal; the original drawing tolerances control.

Wired receiving-system handover

Use the receiving-input specification and issued diagram. Include units and leave unresolved items open for review.

Readout options and document scope

Calibration, structural proof, NDT and third-party acceptance are separate scopes. Selecting an item requests review; it does not establish certification or a safety-rated function.

Project context and confidentiality

Review the unsigned NDA draft. Confidentiality starts with agreed terms and authorized signatures, not a checkbox.

Open in email app

Your email app sends the message. Attach drawings there. Copy RFQ also keeps the complete text for your existing project thread.

BEFORE YOU ISSUE THE RFQ

Bridge inputs, current loops and digital handover

Can I connect an mV/V bridge directly to a 24V PLC input?

A bridge needs the specified excitation and a compatible low-level differential measurement input or amplifier. A 24V supply or ordinary current/voltage input does not establish compatibility. Use the sensor and receiving equipment specifications and the issued wiring diagram.

Does a 4-20mA label tell me whether the transmitter is two-wire?

No. Specify loop-powered or separately powered operation, active/passive input arrangement, supply, load budget, grounding and isolation. A four-wire strain-gauge bridge is also a different architecture from a four-wire current transmitter.

Are M12 pins, cable colors and Modbus registers standardized here?

This page assigns no universal terminal or cable-color map. Match the exact connector, transmitter and PLC input; request the issued wiring diagram. For Modbus, obtain the device register map, scale, byte/word order and communications settings.

Does a wired reading provide an approved crane overload cutoff?

A measurement or alarm signal is not an approved machine safety function by itself. Define the intended control use, loss-of-power/signal behavior, controller architecture and required assessment separately for the actual installation.

ASSEMBLY EVIDENCE / DOCUMENTS / WRITTEN RELEASES

Prepare the engineering review before placing the order.

Calculate a two-leg scenario and prepare a separate shackle load-direction review.