Subsea load shackles. Define the pressure boundary and signal path.

For mooring, umbilical and underwater tension measurement, put the operating envelope and topside interface into one specification. Depth is an assembly requirement, not a connector label.

Configuration review ·

Instrumented bow shackle with a long sensing pin and tubular protective cage around the right-hand signal connector
Cabled sensing-pin and guard referenceReference image only: no pressure-qualified subsea specimen, wet-mate connector or ROV handle is represented. Final hardware and depth capability require project-specific evidence.

DEPTH / DURATION / WHOLE-ASSEMBLY CONFIGURATION

Specify the service before choosing the sealing approach.

Operating envelope

Provide depth or external pressure, deployment duration, temperature, pressure cycles, salinity and required storage/transport conditions.

Required evidence
Agreed qualification procedure and acceptance criteria for the selected assembly.

Pressure boundary

Identify sensing pin, electronics enclosure or compensation arrangement, penetrator, bulkhead, connector and cable termination.

Required evidence
A controlled configuration; no depth transfer from one component to the whole system.

Load-bearing joint

State WLL with units, load direction, mating geometry, corrosion exposure, retention method and inspection access.

Required evidence
Assembly rating and calibration setup that correspond to the offered load path.

We do not publish 3,000m or deeper capability as a universal LSH rating. Material grade, corrosion provisions, sealing/compensation, connector and verification scope are selected and documented for the project.

Follow the measurement from water to topside.

  1. Instrumented assemblyPin orientation, centralizing contact, retention and approved mechanical configuration.
  2. Underwater boundarySelected pressure arrangement, connector, cable exit and strain relief.
  3. Cable / umbilicalLength, conductor allocation, electrical losses, shielding and termination.
  4. Topside instrumentSupply, compatible input, scaling, logging and alarm responsibilities.

Request 4–20mA, bridge or a digital interface against the actual cable and receiver arrangement. Specify supply at the relevant terminals, allowable signal error and any isolation or surge requirements. A dry handheld on deck is not automatically compatible with an underwater transmitter.

Compare the above-water cabled family

Name the connector, mating state and handling scope.

For a specified SubConn® or another connector system, supply the exact series/contact layout and the mating half. Confirm whether connections are made dry or underwater, the allowed mated/unmated pressure conditions, cable specification, handling and maintenance procedure.

Manufacturer instructions are configuration-specific. For example, MacArtney’s SubConn handling instructions distinguish connector handling, lubrication and mating practices. They do not qualify an LSH assembly or establish cross-brand compatibility.

ROV handling needs its own arrangement drawing.

State the manipulator, approach direction, available grasp envelope and required T-bar, handle or pull arrangement. Show how the tool approaches the keeper and connector without loading the cable exit.

An ROV handle is a handling interface. A release mechanism, hydraulic actuation or remotely operated disconnect is a separate mechanical scope and is not implied by the LSH-ROV family name.

Release the scope and drawing before fabrication

Keep acoustic telemetry separate from a radio-cap option.

If the job needs an acoustic link, specify distance, water conditions, update/latency needs, power budget, transducers, topside equipment and loss-of-link behavior. Treat it as a separate engineered architecture, with availability and qualification confirmed in writing.

For the wired request below, include depth, duration, cable length, exact connector and topside input in the environment/fit notes. Request structural proof, calibration and pressure evidence as distinct records. Define the document scope.

DRAWING REVIEW / EMAIL RFQ

Build a specification your engineer can review.

Choose the connection, signal and documents. Review the complete English RFQ, then open your email app or copy it into your existing project thread.

Attach your drawing in your own email app. Company information and selections stay in this browser until you choose to send or copy them.

Selected option allowancesProject quote

Budget additions only. Items marked Project quote, the base assembly, interface matching and third-party attendance are quoted separately.

Download RFQ worksheets and the NDA draft

Request scope and units

Changing units converts entered numeric loads and dimensions. Depth and drawing notes keep their explicitly stated units. Converted numbers are nominal; the original drawing tolerances control.

Readout options and document scope

Calibration, structural proof, NDT and third-party acceptance are separate scopes. Selecting an item requests review; it does not establish certification or a safety-rated function.

Project context and confidentiality

Review the unsigned NDA draft. Confidentiality starts with agreed terms and authorized signatures, not a checkbox.

Open in email app

Your email app sends the message. Attach drawings there. Copy RFQ also keeps the complete text for your existing project thread.

BEFORE YOU ISSUE THE RFQ

Depth ratings, wet-mate interfaces and underwater telemetry

Does an IP68 label establish a 3,000m depth rating?

No. State depth, pressure, duration, temperature, cycling and the actual assembly configuration. An ingress-protection label or connector rating alone does not qualify the complete instrumented shackle for the requested service.

Is a wet-mate connector included with every subsea request?

No connector is implied by the reference photo. Specify the exact maker, series, contact arrangement, mating state, pressure requirement, cable and termination. Wet-mate and dry-mate requirements must be distinguished in the agreed configuration.

Can I use the normal above-water wireless cap underwater?

An above-water radio link is not the underwater signal path offered by this page. Define a wired route to the topside system. If acoustic telemetry is required, request a separately engineered system with its own transducers, power, protocol and acceptance evidence.

Does the pictured cabled assembly prove subsea or ROV qualification?

No. The image is a cabled pin and guard reference, not a pressure-qualified subsea specimen or proof of wet-mate capability. The offered assembly drawing, actual equipment evidence and agreed qualification records must identify the subsea configuration.

ASSEMBLY EVIDENCE / DOCUMENTS / WRITTEN RELEASES

Prepare the engineering review before placing the order.

Calculate a two-leg scenario and prepare a separate shackle load-direction review.