LoadShackle / Engineering resources / Water-bag & bollard-pull testing

CRANE PROOF TEST / MEASURED BOUNDARY / HORIZONTAL PULL

Water-bag proof testing: define what the load cell will actually measure.

Scope a water-bag test or bollard-pull measurement kit around the actual load path, the approved test requirements and the record the project needs. Bag capacity, suspended load and the force seen by a particular sensor are different quantities.

Engineering selection resource · Reviewed

Measurement boundaryAn abstract test rig places a measuring point above suspended test equipment; actual arrangement requires its own test plan.FUNCTIONAL INTERFACES / CONCEPT ONLYMEASURING POINTidentify tare and load pathSuspended equipment below this point is part of the review.
Measurement boundaryAn abstract test rig places a measuring point above suspended test equipment; actual arrangement requires its own test plan. Concept illustration; not a production drawing or approved arrangement.

START THE REVIEW HERE

Test item, measurement boundary and required record.

  1. 01Define the test item and responsible test-plan authority.
  2. 02Mark which mass and forces lie inside the measurement boundary.
  3. 03Specify rigging, readout, logging and documents as separate kit items.

ENGINEERING RESOURCES / 01

Put the measurement boundary on the rigging sketch.

For a suspended bag arrangement, identify the bag, its lifting set, any spreader and every connector below the measuring point. State which tare is included in the indicated load and how the required record treats it. A bag's nominal capacity is not a live force reading.

For a horizontal bollard-pull arrangement, identify the line, fairlead or termination geometry and the sensor contact interfaces. A steady pull record and a transient peak are different data requirements; specify which the project needs.

A sensor in one angled bridle leg measures that leg’s tension; a measuring point above a bag cluster has a different load boundary. Identify the actual positions and angles before interpreting or combining readings. Water density and the filling medium also affect any volume-based estimate.

Instrumented bow shackle and sensing pin next to a large coil of black signal cable, diagonal view
Cabled instrumented-shackle referenceThis image shows a measurement assembly and cable arrangement, not a verified water-bag test setup, bag, proof-load rating or complete supplied kit.

ENGINEERING RESOURCES / 02

Separate the lifting set from the measurement and logging chain.

JW Automarine's guidance treats the water bag and lifting set as an identified arrangement with specific instructions. Use the actual equipment documentation when defining the project, including filling/discharge and the consequences of a failure. This checklist is for procurement and measurement planning, not an operating sequence.

Separate the lifting set from the measurement and logging chain.
Kit itemState the requested scope
Bags and lifting setExisting manufacturer/model, capacity, inspection identity and intended arrangement
Connection hardwareMating eyes, bearing contact, pin retention, clearance and approved loading directions
Sensor and readoutRequested measurement range, output, compatible readout and calibration chain
Data recordPeak or time history, units, timestamps, sampling needs and export format
Site and witnessWater supply/discharge, working envelope, test-plan authority and attendance scope

Source context: JW Automarine: water-weight load-test bag guidance · JW Automarine: water-bag instruction manual

ENGINEERING RESOURCES / 03

The required proof load and hold time come from the applicable test plan.

Record the equipment under test, its applicable requirements, the responsible competent person and the acceptance criteria. Do not calculate a field proof load by applying a generic percentage to a web catalogue WLL.

HSE explains that examination and testing are not interchangeable and that routine overload testing is not required for most lifting equipment. The decision to test, the method and the records depend on the actual equipment and applicable requirements.

Review sudden load loss, stored energy and possible crane/boom response in the project risk assessment. A release mechanism does not replace the actual bag’s controlled-discharge requirements. The test-plan authority must define the relevant equipment response and exclusion arrangements.

Structural proof scope

Identify the item, configuration, required load case and acceptance responsibility.

Measurement scope

Identify sensor/readout, force range, calibration setup and the required uncertainty or resolution.

Witness and report scope

Specify who observes the test, what is recorded and who issues the relevant document.

Source context: HSE: thorough examination and load testing

ENGINEERING RESOURCES / 04

Specify the record before choosing a peak-hold display.

A display's largest number is not automatically the accepted test result. Define tare, filtering, sampling and the applicable recording procedure with the responsible party. A software-generated record is not, by itself, independent witnessing or class acceptance.

For bollard-pull work, request the specified sampling, averaging window and treatment of line geometry from the project’s test authority. Do not import a universal 30-second or 60-second averaging rule from a different procedure.

Specify the record before choosing a peak-hold display.
Requested resultRecord requirements to discuss
Maximum indicationPeak-hold behavior, reset procedure and the identified sensor/readout
Time-history recordTimestamps, sampling/update behavior, units and export format
Multiple pointsPoint identity, synchronized records and the method of interpreting combined readings
Witnessed evidenceTest item/configuration, instrumentation identities and agreed issuing scope
Silver instrumented bow and waisted central bobbin next to an attached black four-key force indicator with eight status dots and a left cable connector
Local readout and complete sensing connectionReadout reference only. Confirm its actual range, input, logging and calibration configuration for the project.

ENGINEERING RESOURCES / 05

Resolve four project questions before a kit quotation.

  • What exact equipment and load case does the test plan cover?
  • Where is the sensor installed, and which suspended items or line forces does it measure?
  • Which bags, rigging, readout, data system and site services already exist?
  • Which drawing, calibration, inspection, test and witnessing records are requested?
  • Separate an instrumentation-only request from a package that also includes bags, rigging, hoses, site services and witnessing; agree sourcing, packaging and transport scope explicitly.
Water-bag & bollard-pull testing project review worksheet

Blank project-input worksheet. Not an approved design, operating procedure, product specification or certificate.

Download PDFDownload text versionOr prepare the request online →

MANUFACTURER / STANDARDS / REGULATOR CONTEXT

Reference scope for water-bag & bollard-pull testing.

These references explain selection questions. The actual offered configuration, rating, instructions and records must identify the supplied assembly.

BEFORE YOU ISSUE THE RFQ

Water-bag & bollard-pull testing: configuration and purchase questions

Can bag volume replace the load-cell reading?

Treat nominal volume or capacity and measured force as separate quantities. The actual test method determines the required measurement and verification.

Does the displayed load include rigging tare?

It depends on the sensor position and the agreed tare convention. Mark the measured boundary and all suspended items on the sketch.

What proof percentage should I use?

Use the applicable requirements and approved test plan for the equipment under test. This page does not assign a universal percentage or hold time.

Can the same kit measure bollard pull?

Only after reviewing the horizontal load path, mounting/contact, measurement range, duty and recording requirements. A water-bag configuration is not automatically transferable.

Is peak hold enough for a witnessed test?

It depends on the required evidence. Time history, timestamps, identified instrumentation and witness scope may be required separately.

Does a calibrated sensor certify the crane?

No. A measurement record concerns the identified instrument chain; examination, structural testing and acceptance of the crane are separate responsibilities.

Are water bags and witnesses included automatically?

No. List existing and requested equipment and services explicitly. Availability and supplied scope are confirmed in the quotation.

Can I send an existing bag and rigging drawing?

Yes. Include identities, dimensions, requested load and units, duty, readout/logging needs and document scope; agree confidentiality before sensitive CAD exchange.

PROJECT INPUTS / EMAIL HANDOVER

Put the water-bag & bollard-pull testing requirements in one request.

Enter what is known and leave unresolved values blank. Your choices stay in this browser until you copy them or open your email application.

List the drawing and requested records. Supply scope and availability are confirmed after reviewing the actual configuration.

Open worksheets and the NDA draft in a new tab
Water-bag & bollard-pull testing project inputs
Open in email app

Your email app sends the message. Attach drawings there. Copy request also keeps the complete text for your existing project thread.